Integrated master study · Revision 05

Digital experience.
Measured investment.

Audiovisual systems · Architectural lighting · Decorative lighting · Remote CMS · Investor economics

Concept visual — illustrative placement, not an as-built installation

Concept film · 89 seconds

From the main gates to the grand atrium

Animated from the original concept visuals · illustrative placement, not an as-built installationDownload 5.1 surround master

Investment snapshot

An experience-led asset. A transparent investment case.

$100,000
Phase-one capital
Six-screen pilot; not the whole mall
$29,280
Year-one net cash
Illustrative base, before tax / debt
3.31 yrs
Modelled cash payback
Five-year case, including Y4 refresh
15.8%
Five-year project IRR
Zero terminal / resale value

Invest in a controlled first phase

One fine-pitch indoor LED wall, five professional signage displays, local media players, a 12-speaker audio pilot, selected lighting and a shared content-management foundation. Full-mall LED façades and the suspended atrium feature remain separate investments.

What makes the model investable

Eight commercial positions are sold as a single six-screen network. The base case assumes $850 per slot per month, 65% average fill and $10,000 yearly activation revenue. Cash is calculated after concession fees, sales costs and running expenses.

Explore the scenarios

Document control

What is verified, proposed and still unknown

Control itemRevision 05 basis
Prepared forAmerican Mall owner / development and investment stakeholders
Prepared bySkyVelor Company — concept and integration design: Engineer Khalil Ajouz
Branding sourceLibrary logo reads SKYVELOR INFOTECHS S.I.T. The company name “SkyVelor Company” is used throughout this edition; legal trading style is to be confirmed.
Location“Eliposeria” is the client-supplied location wording. Country, site jurisdiction, currency of procurement and applicable authorities remain unverified.
Drawing statusTwo DWG uploads, embedded preview images only. No verified scaled floor plans, survey coordinates or room schedule.
Financial statusUSD planning allowances, independently calculated scenarios. No vendor quote, contractual return, tax ruling or guaranteed income.
[V] Manufacturer-published family data[P] Proposed engineering requirement[C] Calculation[TBC] Verification / approval hold